I promised to show the remodel . . . so here goes . . .
I finally had some time to upload the photos from my projects this spring and summer. Travel has been taking up a lot of time this summer with several projects ongoing at any given time but I was able to finish several things going on. The bathroom project took much more time than originally thought. It started during the winter after the first bathroom remodel went quickly over a couple weeks. It was minor compared to the master bath. A quick make over with a new moose light fixture, paint, and remove and replace the vinyl flooring with tile. I also relocated the sink and base cabinet to give additional room by the toilet. I took bi-fold doors from the bedroom and installed them in the small closet. Two weekends and the project was done and looked great. I can’t remember if I came home from a trip or just home from work a couple weekends later to find my wife had taken hammer and chisel to the tile in the master shower. This was between Than...